In Dordrecht (NL) a part of a waste-recycle plant had to be replaced. The Gottwald AK 680-3 was brought over from the UK and made this look like an easy job. Sarens Netherlands had some pictures of this project which I had lent.
The crane was rigged with a long mainboom but without maxilift.
As you can clearly see these pictures are taken after the overhaul/upgrade since the Demag-cabs are fitted. The crane is also upgraded by Euro-Rigging.
A very nice crane and I wish I can see this crane for real once.
On www.flickr.com Geoff had placed a picture of the AK 680-3 during the construction of the Wolverhampton Station.