Early december 2005 Franz Bracht was building a Siemens windmill in The Netherlands with their CC 2800-1.
Personally I really like the design of the CC 2800(-1) and this was a nice oppertunity to see the CC 2800-1 from Franz Bracht.
The crane was rigged with flying superlift counterweight and stinger. The stinger pushes the SL-counterweight further backwards so less counterweight can be used.
The boom was rigged in Vessel-lift configuration.
Helping crane was this LTM 1200 from De Kil (Sarens Netherlands).
Fin Hansen was present to transport the windmill parts.